{"id":125974,"date":"2026-03-26T12:19:55","date_gmt":"2026-03-26T12:19:55","guid":{"rendered":"https:\/\/alj.com\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/"},"modified":"2026-04-03T12:45:32","modified_gmt":"2026-04-03T12:45:32","slug":"powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition","status":"publish","type":"perspective","link":"https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/","title":{"rendered":"Alimenter l\u2019avenir : comment les engagements climatiques des entreprises acc\u00e9l\u00e8rent-ils la transition \u00e9nerg\u00e9tique ?"},"content":{"rendered":"<p>La crise climatique est l\u2019un des d\u00e9fis les plus urgents et complexes auxquels l\u2019humanit\u00e9 est aujourd\u2019hui confront\u00e9e. La hausse des <a href=\"https:\/\/alj.com\/en\/spotlight-by-fady-jameel\/the-economic-costs-of-climate-change\/\">temp\u00e9ratures mondiales<\/a>, les <a href=\"https:\/\/alj.com\/en\/spotlight-by-fady-jameel\/wildfires-and-climate-change-todays-burning-issue\/\">ph\u00e9nom\u00e8nes m\u00e9t\u00e9orologiques<\/a> de plus en plus graves, la <a href=\"https:\/\/alj.com\/en\/spotlight-by-fady-jameel\/preserving-the-wonders-of-wetlands\/\">perte de biodiversit\u00e9<\/a> et la pression croissante sur les <a href=\"https:\/\/alj.com\/en\/spotlight-by-fady-jameel\/investing-in-nature\/\">ressources naturelles<\/a> remod\u00e8lent les \u00e9conomies, les infrastructures et les moyens de subsistance dans le monde entier.<\/p>\n<p>Au-del\u00e0 des cons\u00e9quences environnementales, le changement climatique est d\u00e9sormais largement reconnu comme un risque syst\u00e9mique, qui affecte la s\u00e9curit\u00e9 \u00e9nerg\u00e9tique, les cha\u00eenes d\u2019approvisionnement, la stabilit\u00e9 financi\u00e8re et l\u2019\u00e9quit\u00e9 sociale. Pour les organisations de toutes tailles, la transition vers une \u00e9conomie \u00e0 faibles \u00e9missions de carbone n\u2019est pas une aspiration lointaine, mais un imp\u00e9ratif strat\u00e9gique imm\u00e9diat.<\/p>\n<p>Relever un d\u00e9fi de cette envergure exige une action collective.<\/p>\n<p>Les gouvernements jouent un r\u00f4le essentiel en d\u00e9finissant l\u2019orientation politique et en promouvant les investissements\u00a0; les communaut\u00e9s sont d\u00e9terminantes pour garantir que la transition \u00e9nerg\u00e9tique est inclusive et b\u00e9n\u00e9fique au niveau local\u00a0; et les entreprises apportent l\u2019innovation, le capital et les capacit\u00e9s op\u00e9rationnelles n\u00e9cessaires pour acc\u00e9l\u00e9rer le rythme du changement. La collaboration entre ces parties prenantes est fondamentale pour construire des infrastructures r\u00e9silientes, mettre \u00e0 l\u2019\u00e9chelle les technologies propres et garantir que la transition apporte de la valeur pour l\u2019environnement comme pour l\u2019\u00e9conomie. Quelques-unes des plus grandes entreprises au monde peuvent montrer la voie.<\/p>\n<p>Il est encourageant de constater que de nombreuses entreprises internationales se sont manifest\u00e9es avec des engagements ambitieux en mati\u00e8re d\u2019\u00e9nergies renouvelables et de z\u00e9ro \u00e9mission nette, reconnaissant que le leadership climatique est \u00e9troitement li\u00e9 \u00e0 la comp\u00e9titivit\u00e9 \u00e0 long terme et \u00e0 la confiance des consommateurs. Les grandes organisations ont la capacit\u00e9 de catalyser les march\u00e9s, de stimuler les investissements et de contribuer \u00e0 mettre en service de nouveaux projets renouvelables, en cr\u00e9ant souvent des effets d\u2019entra\u00eenement qui profitent aux cha\u00eenes d\u2019approvisionnement, aux \u00e9conomies locales et au syst\u00e8me \u00e9nerg\u00e9tique plus large.<\/p>\n<h2>De quelle fa\u00e7on Microsoft a-t-elle fait preuve d\u2019un leadership climatique d\u2019entreprise\u00a0?<\/h2>\n<p>Un jalon r\u00e9cent de Microsoft met en \u00e9vidence cette dynamique en action. En d\u00e9but d\u2019ann\u00e9e, la soci\u00e9t\u00e9 a annonc\u00e9 qu\u2019elle avait atteint avec succ\u00e8s son objectif en mati\u00e8re d\u2019\u00e9nergie renouvelable pour 2025, qui consistait \u00e0 compenser 100\u00a0% de l\u2019\u00e9lectricit\u00e9 utilis\u00e9e dans ses centres de donn\u00e9es, b\u00e2timents et campus par des \u00e9nergies renouvelables<a href=\"#_ftn1\" name=\"_ftnref1\">[1]<\/a>. Pour ce faire, Microsoft a sign\u00e9 des contrats portant sur 40\u00a0gigawatts d\u2019\u00e9nergie renouvelable qui seront ajout\u00e9s au r\u00e9seau \u00e0 l\u2019\u00e9chelle mondiale par le biais d\u2019accords \u00e0 long terme. Cela permettra le d\u00e9veloppement et le raccordement au r\u00e9seau de nouveaux projets solaires, \u00e9oliens et fond\u00e9s sur d\u2019autres \u00e9nergies propres. Parmi ceux-ci, 19\u00a0GW sont d\u00e9j\u00e0 mis en service.<\/p>\n<p>Cette r\u00e9alisation r\u00e9volutionnaire t\u00e9moigne non seulement de l\u2019ampleur de l\u2019engagement de Microsoft, mais \u00e9galement de l\u2019\u00e9cosyst\u00e8me collaboratif n\u00e9cessaire pour le r\u00e9aliser, incluant des promoteurs, des compagnies de services publics, des d\u00e9cideurs politiques et des communaut\u00e9s locales. Il fournit un exemple puissant de la mani\u00e8re dont l\u2019ambition audacieuse d\u2019une entreprise, associ\u00e9e \u00e0 des investissements et des partenariats durables, peut contribuer \u00e0 g\u00e9n\u00e9rer des progr\u00e8s significatifs dans la transition mondiale vers les \u00e9nergies renouvelables.<\/p>\n<h2>O\u00f9 Microsoft s\u2019est-elle procur\u00e9 son \u00e9nergie renouvelable\u00a0?<\/h2>\n<p>Le succ\u00e8s de Microsoft pour compenser 100\u00a0% de sa consommation d\u2019\u00e9lectricit\u00e9 par des \u00e9nergies renouvelables repose sur un portefeuille diversifi\u00e9 de projets couvrant une vari\u00e9t\u00e9 de zones g\u00e9ographiques, de technologies et de mod\u00e8les de partenariat. Plut\u00f4t que de d\u00e9pendre d\u2019une solution ou d\u2019un partenaire unique, la soci\u00e9t\u00e9 a combin\u00e9 des contrats d\u2019achat d\u2019\u00e9lectricit\u00e9 \u00e0 long terme, des investissements ax\u00e9s sur la communaut\u00e9 et une modernisation d\u2019infrastructures de fa\u00e7on \u00e0 mettre en service de nouvelles capacit\u00e9s renouvelables tout en renfor\u00e7ant les syst\u00e8mes \u00e9nerg\u00e9tiques locaux.<\/p>\n<p>Aux \u00c9tats-Unis, par exemple, Microsoft s\u2019est associ\u00e9e \u00e0 <a href=\"https:\/\/www.solsystems.com\/\">Sol Systems<\/a> pour soutenir des projets solaires \u00e0 grande \u00e9chelle, con\u00e7us pour fournir \u00e0 la fois une \u00e9lectricit\u00e9 propre et des avantages \u00e9conomiques \u00e0 l\u2019\u00e9chelle locale.<\/p>\n<figure id=\"attachment_125935\" aria-describedby=\"caption-attachment-125935\" style=\"width: 1024px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-125935 size-full\" src=\"https:\/\/media.alj.com\/app\/uploads\/2026\/03\/Sol-Systems1_2000-1024x682-1.jpg\" alt=\"Microsoft Sol Systems FRV Eldorado\" width=\"1024\" height=\"682\" srcset=\"https:\/\/media.alj.com\/app\/uploads\/2026\/03\/Sol-Systems1_2000-1024x682-1.jpg 1024w, https:\/\/media.alj.com\/app\/uploads\/2026\/03\/Sol-Systems1_2000-1024x682-1-300x200.jpg 300w, https:\/\/media.alj.com\/app\/uploads\/2026\/03\/Sol-Systems1_2000-1024x682-1-150x100.jpg 150w, https:\/\/media.alj.com\/app\/uploads\/2026\/03\/Sol-Systems1_2000-1024x682-1-768x512.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption id=\"caption-attachment-125935\" class=\"wp-caption-text\">The Eldorado solar farm in Illinois, USA. Photo Credit: \u00a9 Sol Systems.<\/figcaption><\/figure>\n<p>Un exemple remarquable \u00e0 Eldorado, dans l\u2019Illinois, illustre le concept de l\u2019\u00e9nergie solaire \u00e0 double usage, o\u00f9 l\u2019activit\u00e9 agricole continue sous les panneaux solaires. Le projet combine la production d\u2019\u00e9nergie avec des initiatives \u00e9ducatives, un d\u00e9veloppement de la main-d\u2019\u0153uvre et un financement communautaire con\u00e7u pour cr\u00e9er de la valeur \u00e0 long terme, au-del\u00e0 de la seule production d\u2019\u00e9lectricit\u00e9.<\/p>\n<p>En Virginie-Occidentale, un accord avec <a href=\"https:\/\/bep.brookfield.com\/\">Brookfield Renewable Energy Group<\/a> a permis de revitaliser des actifs d\u2019\u00e9nergie hydraulique existants tout en cr\u00e9ant de nouvelles capacit\u00e9s renouvelables. Les investissements dans des installations telles que la centrale de Hawk\u2019s Nest prolongent la dur\u00e9e de vie op\u00e9rationnelle d\u2019une infrastructure \u00e9tablie et raccordent une nouvelle production d\u2019\u00e9lectricit\u00e9 propre au r\u00e9seau.<\/p>\n<p>De m\u00eame, gr\u00e2ce \u00e0 des accords avec <a href=\"https:\/\/edp.com\/en\/north-america\/na\">EDP Renewables North America<\/a>, Microsoft a soutenu des projets solaires et \u00e9oliens dans plusieurs \u00c9tats am\u00e9ricains, qui fournissent une \u00e9lectricit\u00e9 propre ainsi que des opportunit\u00e9s de revenus stables pour des propri\u00e9taires fonciers et des autorit\u00e9s locales. Les investissements communautaires li\u00e9s \u00e0 ces projets comprennent le financement d\u2019\u00e9coles, de services d\u2019urgence et d\u2019infrastructures. Cela souligne la mani\u00e8re dont le d\u00e9ploiement des \u00e9nergies renouvelables peut renforcer la r\u00e9silience r\u00e9gionale tout en contribuant \u00e0 une production fiable raccord\u00e9e au r\u00e9seau.<\/p>\n<p>Au Br\u00e9sil, l\u2019approvisionnement en \u00e9nergie renouvelable de Microsoft comprend un complexe \u00e9olien exploit\u00e9 par <a href=\"https:\/\/www.aurenenergia.com.br\/\">Auren Energia<\/a>. Au-del\u00e0 de la contribution en \u00e9nergie renouvelable au r\u00e9seau, le projet a permis d\u2019am\u00e9liorer les infrastructures, de cr\u00e9er des emplois locaux et de renforcer les comp\u00e9tences. En parall\u00e8le, la collaboration avec ENGIE en France se concentre sur le renouvellement des parcs \u00e9oliens existants, en rempla\u00e7ant des composants vieillissants par une technologie plus efficace afin d\u2019augmenter consid\u00e9rablement la production sans \u00e9tendre l\u2019utilisation de terres.<\/p>\n<h2>Comment FRV aide-t-elle Microsoft \u00e0 mener la transition \u00e9nerg\u00e9tique\u00a0?<\/h2>\n<p>Parmi les exemples les plus convaincants, on peut citer le partenariat de Microsoft avec Fotowatio Renewable Ventures (<a href=\"https:\/\/frv.com\/en\/\">FRV<\/a>), \u00e0 la centrale solaire <a href=\"https:\/\/alj.com\/en\/news\/frv-australias-largest-solar-farm-now-fully-operational\/\">Walla Walla<\/a> en Nouvelle-Galles du Sud, en Australie.<\/p>\n<p>Ce projet illustre l\u2019importance d\u2019int\u00e9grer l\u2019engagement communautaire dans le d\u00e9veloppement d\u2019\u00e9nergie renouvelable d\u00e8s le d\u00e9part. La centrale solaire de 353\u00a0m\u00e9gawatts CC apportera une capacit\u00e9 \u00e9nerg\u00e9tique propre consid\u00e9rable tout en soutenant plus largement la transition de l\u2019Australie vers l\u2019abandon de la production d\u2019\u00e9nergie issue du charbon. Elle permettra d\u2019approvisionner en \u00e9lectricit\u00e9 durable des dizaines de milliers de foyers chaque ann\u00e9e.<\/p>\n<p><iframe loading=\"lazy\" title=\"Jameel Energy &amp; FRV Australia announce Walla Walla PV plant completion (EN VO subs)\" width=\"640\" height=\"360\" src=\"https:\/\/www.youtube.com\/embed\/eszUTkAGcI4?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<p>L\u2019une des caract\u00e9ristiques qui distinguent ce projet est la profondeur de son impact local, avec la cr\u00e9ation d\u2019emplois, la relance \u00e9conomique de la r\u00e9gion et le soutien au renforcement des comp\u00e9tences en mati\u00e8re d\u2019\u00e9nergies renouvelables. L\u2019\u00e9quipe du projet a travaill\u00e9 en \u00e9troite collaboration avec les parties prenantes locales pour s\u2019assurer que les priorit\u00e9s de la communaut\u00e9 \u00e9taient abord\u00e9es. Cela incluait le financement de la modernisation d\u2019infrastructures et la restauration d\u2019installations communautaires. Des initiatives telles que l\u2019am\u00e9lioration des espaces publics et le soutien aux am\u00e9nagements locaux d\u00e9montrent comment les projets renouvelables peuvent apporter des avantages tangibles qui vont bien au-del\u00e0 de la production d\u2019\u00e9nergie.<\/p>\n<p>Le projet refl\u00e8te \u00e9galement une planification de l\u2019utilisation des terres et une gestion environnementale r\u00e9fl\u00e9chies. En tirant parti de la proximit\u00e9 avec l\u2019infrastructure de transmission existante, l\u2019installation a pu minimiser les perturbations suppl\u00e9mentaires du r\u00e9seau tout en acc\u00e9l\u00e9rant le calendrier de d\u00e9ploiement. La collaboration de FRV avec la communaut\u00e9 sur la gestion des terres, les mesures de pr\u00e9vention des incendies et les enjeux de biodiversit\u00e9 met encore davantage en avant la maturit\u00e9 croissante des projets solaires \u00e0 grande \u00e9chelle. En outre, les efforts visant \u00e0 r\u00e9affecter les mat\u00e9riaux de construction, y compris le recyclage des emballages en bois pour une utilisation par la communaut\u00e9, d\u00e9montrent comment les principes de l\u2019<a href=\"https:\/\/alj.com\/en\/spotlight-by-fady-jameel\/wrapping-our-minds-around-a-circular-economy\/\">\u00e9conomie circulaire<\/a> peuvent \u00eatre int\u00e9gr\u00e9s \u00e0 la livraison du projet.<\/p>\n<h2>Quels autres projets FRV a-t-elle en Australie\u00a0?<\/h2>\n<p><a href=\"https:\/\/alj.com\/en\/news\/frv-australias-largest-solar-farm-now-fully-operational\/\">Walla Walla<\/a> n\u2019est qu\u2019un des nombreux projets pionniers similaires dans lesquels FRV est impliqu\u00e9e aux quatre coins du globe. Fond\u00e9e en 2006 et faisant partie de <a href=\"https:\/\/alj.com\/en\/energy-and-environmental-services\/energy-overview\/\">Jameel Energy<\/a> depuis 2015, FRV est pass\u00e9e d\u2019\u00eatre un pionnier pr\u00e9coce de l\u2019\u00e9nergie solaire \u00e0 une plateforme renouvelable diversifi\u00e9e, qui couvre l\u2019\u00e9nergie solaire, le stockage par batteries, les infrastructures hybrides et les solutions d\u2019\u00e9nergie num\u00e9rique novatrices. Avec un portefeuille de 3\u00a0GW d\u2019\u00e9nergie verte en exploitation et 1\u00a0GW suppl\u00e9mentaire en construction, sur quatre continents, sa proposition a pour axe de fournir une \u00e9nergie propre fiable et comp\u00e9titive, tout en travaillant en \u00e9troite collaboration avec des partenaires, des communaut\u00e9s et des clients pour s\u2019assurer que les projets contribuent \u00e0 la r\u00e9silience du syst\u00e8me au sens large et \u00e0 la cr\u00e9ation de valeur locale.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-123412\" src=\"https:\/\/media.alj.com\/app\/uploads\/2025\/09\/Walla-Walla.jpg\" alt=\"\" width=\"1920\" height=\"1079\" srcset=\"https:\/\/media.alj.com\/app\/uploads\/2025\/09\/Walla-Walla.jpg 1920w, https:\/\/media.alj.com\/app\/uploads\/2025\/09\/Walla-Walla-300x169.jpg 300w, https:\/\/media.alj.com\/app\/uploads\/2025\/09\/Walla-Walla-1024x575.jpg 1024w, https:\/\/media.alj.com\/app\/uploads\/2025\/09\/Walla-Walla-150x84.jpg 150w, https:\/\/media.alj.com\/app\/uploads\/2025\/09\/Walla-Walla-768x432.jpg 768w, https:\/\/media.alj.com\/app\/uploads\/2025\/09\/Walla-Walla-1536x863.jpg 1536w, https:\/\/media.alj.com\/app\/uploads\/2025\/09\/Walla-Walla-226x126.jpg 226w\" sizes=\"(max-width: 1920px) 100vw, 1920px\" \/><\/p>\n<p>D\u00e8s le d\u00e9part, la croissance de FRV a \u00e9t\u00e9 \u00e9troitement li\u00e9e \u00e0 son mod\u00e8le ax\u00e9 sur les partenariats. Depuis ses origines europ\u00e9ennes, la soci\u00e9t\u00e9 s\u2019est \u00e9tendue vers l\u2019Australie, l\u2019Am\u00e9rique, le Moyen-Orient et certaines r\u00e9gions d\u2019Asie, en faisant ses preuves dans de multiples environnements r\u00e9glementaires et contextes d\u2019infrastructure. Cette pr\u00e9sence internationale a permis \u00e0 FRV de jouer de plus en plus le r\u00f4le de propri\u00e9taire et exploitant d\u2019actifs \u00e0 long terme, et pas seulement de promoteur. Cette \u00e9volution refl\u00e8te un changement strat\u00e9gique vers l\u2019optimisation du cycle de vie et un engagement plus profond en faveur des besoins \u00e9nerg\u00e9tiques en \u00e9volution des clients.<\/p>\n<p>En Australie, au-del\u00e0 du projet Walla Walla qui a aid\u00e9 Microsoft \u00e0 atteindre ses objectifs en mati\u00e8re d\u2019\u00e9nergie renouvelable, FRV a consolid\u00e9 sa position de d\u00e9veloppeur d\u2019infrastructure majeur. Elle exploite d\u00e9sormais 8\u00a0projets d\u2019\u00e9nergie renouvelable dans le pays, dont <a href=\"https:\/\/alj.com\/en\/news\/abdul-latif-jameel-energys-frv-achieves-financial-close-for-its-10th-solar-farm-in-australia\/\">Lilyvale<\/a> et <a href=\"https:\/\/alj.com\/en\/news\/operations-begin-at-frv-australias-first-hybrid-pv-battery-storage-project\/\">Dalby<\/a> (Queensland), <a href=\"https:\/\/alj.com\/en\/news\/frv-secures-financing-for-winton-solar-farm-in-victoria-australia\/\">Winton<\/a> (Victoria) et <a href=\"https:\/\/alj.com\/en\/news\/abdul-latif-jameel-energys-frv-achieves-commercial-operation-status-with-metz-solar-farm-in-australia\/\">Metz<\/a>, <a href=\"https:\/\/alj.com\/en\/news\/abdul-latif-jameel-energy-delivers-goonumbla-solar-farm-to-supply-45000-australian-homes\/\">Goonumbla<\/a>, <a href=\"https:\/\/alj.com\/en\/news\/abdul-latif-jameel-energy-secures-green-finance-from-ing-for-seventh-solar-farm-in-australia\/\">Sebastopol<\/a> et <a href=\"https:\/\/alj.com\/en\/news\/abdul-latif-jameel-energys-frv-completes-refinancing-of-moree-solar-farm-in-australia\/\">Moree<\/a> en Nouvelle-Galles du Sud.<\/p>\n<p>\u00c0 mesure que la p\u00e9n\u00e9tration des \u00e9nergies renouvelables augmente et que les tendances de la demande en \u00e9lectricit\u00e9 deviennent plus variables, le stockage \u00e9merge comme un catalyseur essentiel de la fiabilit\u00e9. FRV a r\u00e9agi en \u00e9largissant son empreinte de stockage d\u2019\u00e9nergie sur batterie dans plusieurs march\u00e9s. Cette strat\u00e9gie refl\u00e8te une \u00e9volution plus large du secteur, qui consiste \u00e0 aller au-del\u00e0 de la g\u00e9n\u00e9ration pure vers des solutions int\u00e9gr\u00e9es capables d\u2019\u00e9quilibrer l\u2019offre et la demande, d\u2019am\u00e9liorer la pilotabilit\u00e9 et de soutenir la stabilit\u00e9 du r\u00e9seau.<\/p>\n<p>En ao\u00fbt\u00a02025, FRV a atteint l\u2019\u00e9tape de la cl\u00f4ture financi\u00e8re pour le projet <a href=\"https:\/\/alj.com\/en\/news\/frv-australia-completes-financial-close-of-the-250mw-500-mwh-gnarwarre-battery-project\/\">Gnarwarre<\/a> de 250\u00a0MW\u00a0\/\u00a0500\u00a0MWh \u00e0 Victoria, son plus grand syst\u00e8me de stockage d\u2019\u00e9nergie par batterie (SSEB) en Australie \u00e0 ce jour.<\/p>\n<p><iframe loading=\"lazy\" title=\"FRVs&#039; Jameel Energy announce the financial close of Gnarwarre solar PV plant (EN VO Subs)\" width=\"640\" height=\"360\" src=\"https:\/\/www.youtube.com\/embed\/N7eVrwjCSag?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<p>Con\u00e7u pour am\u00e9liorer la stabilit\u00e9 du r\u00e9seau et faciliter l\u2019int\u00e9gration des \u00e9nergies renouvelables, le projet incorpore une technologie d\u2019onduleur capable de former le r\u00e9seau et a re\u00e7u le soutien de l\u2019Agence australienne pour les \u00e9nergies renouvelables en faveur du renforcement de la capacit\u00e9 de service du syst\u00e8me. Un autre projet \u00e0 Victoria, l\u2019installation SSEB <a href=\"https:\/\/alj.com\/en\/news\/frv-australia-reaches-financial-close-for-100mw-200mwh-terang-large-scale-battery-project\/\">Terang<\/a> de 100\u00a0MW, est en cours de d\u00e9veloppement. Situ\u00e9e \u00e0 2,4\u00a0km au nord-est de la ville de Terang, la centrale aura une capacit\u00e9 de 100\u00a0MW\u00a0\/\u00a0200\u00a0MWh.<\/p>\n<p>L\u2019importance du stockage est encore plus prononc\u00e9e en Nouvelle-Galles du Sud, o\u00f9 l\u2019installation SSEB <a href=\"https:\/\/alj.com\/en\/news\/frv-australia-awarded-long-duration-storage-ltesa-for-armidale-east-bess-in-new-south-wales\/\">Armidale East<\/a> de FRV a obtenu un accord de service \u00e9nerg\u00e9tique \u00e0 long terme en f\u00e9vrier\u00a02026 dans le cadre de la Feuille de route de l\u2019\u00c9tat pour l\u2019infrastructure \u00e9lectrique. Avec une capacit\u00e9 totale de 315\u00a0MW, Armidale East est l\u2019un des plus importants projets de batterie de longue dur\u00e9e du pays. Au-del\u00e0 de ses sp\u00e9cifications techniques, le projet int\u00e8gre un cadre officiel d\u2019acceptabilit\u00e9 sociale, d\u00e9crivant ses engagements envers la mobilisation communautaire, la participation de l\u2019industrie locale et l\u2019inclusion des Premi\u00e8res Nations, conform\u00e9ment \u00e0 l\u2019approche de la FRV en mati\u00e8re de partenariat avec les communaut\u00e9s locales.<\/p>\n<p>L\u2019hybridation, ou la colocalisation de la production et du stockage solaires, est une autre caract\u00e9ristique d\u00e9terminante de la strat\u00e9gie de FRV. L\u2019acquisition du <a href=\"https:\/\/alj.com\/en\/news\/frv-australia-acquires-190-mw-hybrid-solar-battery-storage-project\/\">projet Axedale<\/a> \u00e0 Victoria en mars\u00a02025, qui combine 140\u00a0MW\u00a0CA d\u2019\u00e9nergie solaire avec un syst\u00e8me de batterie de 50\u00a0MW\u00a0\/\u00a0100\u00a0MWh, souligne la perspective de la soci\u00e9t\u00e9 selon laquelle les actifs int\u00e9gr\u00e9s offrent une valeur syst\u00e9mique plus solide que les projets autonomes. En combinant les capacit\u00e9s de production et de pilotage, les installations hybrides peuvent lisser la production, r\u00e9duire la congestion et am\u00e9liorer la fiabilit\u00e9 du r\u00e9seau.<\/p>\n<h2>O\u00f9 d\u2019autre FRV est-elle pionni\u00e8re en mati\u00e8re d\u2019\u00e9nergie durable\u00a0?<\/h2>\n<p>L\u2019expansion de FRV au-del\u00e0 de l\u2019Australie r\u00e9v\u00e8le des tendances similaires. En Nouvelle-Z\u00e9lande, le d\u00e9veloppement du projet solaire <a href=\"https:\/\/alj.com\/en\/news\/frv-australia-announces-the-development-of-the-210-mwdc-rangitikei-solar-project-in-new-zealand\/\">Rangitikei<\/a> de 210\u00a0MW\u00a0CC marque une \u00e9tape majeure dans la croissance r\u00e9gionale. Avec une production attendue d\u2019environ 350\u00a0000\u00a0MWh par an, le projet soutient les ambitions nationales de d\u00e9carbonisation tout en cr\u00e9ant des emplois dans la construction et en contribuant \u00e0 l\u2019activit\u00e9 \u00e9conomique locale.<\/p>\n<p>Dans toute l\u2019Europe, FRV a \u00e9galement intensifi\u00e9 son accent sur le stockage d\u2019\u00e9nergie par batterie comme un pilier essentiel de la croissance. En Espagne, la soci\u00e9t\u00e9 a r\u00e9cemment <a href=\"https:\/\/alj.com\/en\/news\/frv-develops-more-than-1-2-gw-5-gwh-of-bess-in-spain-by-2027\/\">annonc\u00e9 des plans<\/a> visant le d\u00e9veloppement de plus de 1,2\u00a0GW et 5\u00a0GWh de capacit\u00e9 de stockage d\u2019ici 2027, en int\u00e9grant des batteries \u00e0 des actifs photovolta\u00efques et en faisant progresser des projets autonomes dans plusieurs r\u00e9gions.<\/p>\n<figure id=\"attachment_123823\" aria-describedby=\"caption-attachment-123823\" style=\"width: 2560px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-123823\" src=\"https:\/\/media.alj.com\/app\/uploads\/2025\/10\/SIMO-scaled.jpg\" alt=\"SIMO Finland FRV BESS\" width=\"2560\" height=\"1920\" srcset=\"https:\/\/media.alj.com\/app\/uploads\/2025\/10\/SIMO-scaled.jpg 2560w, https:\/\/media.alj.com\/app\/uploads\/2025\/10\/SIMO-300x225.jpg 300w, https:\/\/media.alj.com\/app\/uploads\/2025\/10\/SIMO-1024x768.jpg 1024w, https:\/\/media.alj.com\/app\/uploads\/2025\/10\/SIMO-150x113.jpg 150w, https:\/\/media.alj.com\/app\/uploads\/2025\/10\/SIMO-768x576.jpg 768w, https:\/\/media.alj.com\/app\/uploads\/2025\/10\/SIMO-1536x1152.jpg 1536w, https:\/\/media.alj.com\/app\/uploads\/2025\/10\/SIMO-2048x1536.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><figcaption id=\"caption-attachment-123823\" class=\"wp-caption-text\">FRV\u00b4s first joint Battery Energy Storage System site in Simo, Finland, located at the top of the Baltic Sea, just over 100 kilometers below the Arctic Circle. Photo Credit: \u00a9 FRV<\/figcaption><\/figure>\n<p>L\u2019Europe du Nord est un autre centre n\u00e9vralgique. La cl\u00f4ture financi\u00e8re du projet <a href=\"https:\/\/alj.com\/en\/news\/frv-increases-bess-portfolio-with-the-financial-close-of-simo-100mw-200mwh-in-finland\/\">SSEB Simo<\/a> de 100\u00a0MW\u00a0\/\u00a0200\u00a0MWh en Finlande en octobre\u00a02025 consolide la pr\u00e9sence de FRV sur le march\u00e9 nordique. D\u00e9velopp\u00e9 en partenariat avec les parties prenantes locales et soutenu par un financement institutionnel, le projet devrait soutenir l\u2019\u00e9quilibrage du r\u00e9seau et l\u2019int\u00e9gration des \u00e9nergies renouvelables dans une r\u00e9gion qui progresse rapidement vers la d\u00e9carbonisation.<\/p>\n<p>Pour contribuer \u00e0 porter ses ambitions en Europe, FRV a cr\u00e9\u00e9 un Centre d\u2019excellence SSEB \u00e0 Madrid, dirig\u00e9 par <a href=\"https:\/\/www.linkedin.com\/in\/davidmenendezmartin\/\">David Menendez<\/a>. La soci\u00e9t\u00e9 est d\u00e9j\u00e0 impliqu\u00e9e dans des projets SSEB britanniques, tels que <a href=\"https:\/\/alj.com\/en\/news\/abdul-latif-jameel-energys-frv-and-harmony-energy-begin-construction-of-one-the-uks-largest-battery-storage-projects\/\">Clay Tye<\/a>, Essex (99\u00a0MW\u00a0\/\u00a0198\u00a0MWh), <a href=\"https:\/\/alj.com\/en\/news\/abdul-latif-jameel-energys-frv-achieves-financial-close-with-natwest-for-its-holes-bay-battery-project-in-the-uk\/\">Holes Bay<\/a>, Dorset (7,5\u00a0MW\u00a0\/\u00a015\u00a0MWh) et <a href=\"https:\/\/alj.com\/en\/news\/abdul-latif-jameel-energys-frv-energizes-contego-battery-energy-storage-plant\/\">Contego<\/a><a href=\"https:\/\/alj.com\/en\/news\/abdul-latif-jameel-energys-frv-energizes-contego-battery-energy-storage-plant\/\">,<\/a> West Sussex (34\u00a0MW\u00a0\/\u00a068\u00a0MWh). Elle a r\u00e9cemment d\u00e9voil\u00e9 un <a href=\"https:\/\/alj.com\/en\/news\/frv-announces-submission-of-1-8-gw-of-bess-solar-projects-to-uks-gate-2-window-of-nesos-connection-reform-process\/\">portefeuille de 1,8\u00a0GW<\/a> de projets de batteries et d\u2019\u00e9nergie solaire dans le cadre du processus de r\u00e9forme de la connexion de l\u2019op\u00e9rateur national du syst\u00e8me \u00e9nerg\u00e9tique (National Energy System Operator, NESO). Il s\u2019agit d\u2019une refonte majeure du processus de raccordement au r\u00e9seau \u00e9lectrique du Royaume-Uni, con\u00e7ue pour acc\u00e9l\u00e9rer les projets qui soutiennent les objectifs d\u2019\u00e9nergie propre du pays pour 2030.<\/p>\n<p>Plus loin, au Chili, la centrale hybride de Tarapac\u00e1 est actuellement en construction. Avec une puissance de cr\u00eate nominale de 504\u00a0MW, incluant 168\u00a0MW d\u2019\u00e9nergie photovolta\u00efque et 1,34\u00a0GWh (336\u00a0MWh) de stockage sur batterie, le projet couvrira une superficie de 461\u00a0hectares.<\/p>\n<p><iframe loading=\"lazy\" title=\"Jameel Energy&#039;s FRV announces over 1.2 GW BESS expansion in Spain (EN VO Subs)\" width=\"640\" height=\"360\" src=\"https:\/\/www.youtube.com\/embed\/0Rg1kLd17QY?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<p>Parall\u00e8lement \u00e0 ces d\u00e9veloppements sur les march\u00e9s matures, FRV maintient sa bonne performance dans les \u00e9conomies \u00e9mergentes. La mise en service de la centrale photovolta\u00efque de 55\u00a0MW\u00a0CA <a href=\"https:\/\/alj.com\/en\/news\/frv-puts-into-operation-the-masrik-1-62-mwdc-photovoltaic-plant-the-largest-in-armenia\/\">Masrik-1<\/a> en Arm\u00e9nie, qui devrait \u00eatre la plus grande du pays, illustre la capacit\u00e9 de l\u2019entreprise \u00e0 structurer des projets en collaboration avec des institutions financi\u00e8res internationales et des autorit\u00e9s nationales. Fournissant de l\u2019\u00e9lectricit\u00e9 \u00e0 plus de 21\u00a0000\u00a0foyers et \u00e9vitant d\u2019importantes \u00e9missions annuelles de carbone, Masrik-1 refl\u00e8te la contribution plus large de FRV aux syst\u00e8mes \u00e9nerg\u00e9tiques durables, au-del\u00e0 de ses principaux march\u00e9s occidentaux.<\/p>\n<h2>Comment FRV d\u00e9montre-t-elle son engagement envers l\u2019innovation\u00a0?<\/h2>\n<p>Parall\u00e8lement \u00e0 ces jalons de projets majeurs, l\u2019innovation reste un pilier central de la strat\u00e9gie de FRV. Gr\u00e2ce \u00e0 <a href=\"https:\/\/frv.com\/en\/services\/frv-x\/\">FRV-X<\/a>, sa plateforme d\u00e9di\u00e9e \u00e0 l\u2019innovation et \u00e0 l\u2019incubation, la soci\u00e9t\u00e9 explore des technologies et des mod\u00e8les d\u2019affaires \u00e9mergents, ainsi que le d\u00e9veloppement de centres de donn\u00e9es, de plateformes d\u2019\u00e9nergie num\u00e9rique, ainsi que de l\u2019<a href=\"https:\/\/frv.com\/en\/frv-announces-strategic-partnership-with-envision-a-leader-in-total-renewable-energy-solutions-for-h2-cumbuco-project-in-brazil\/\">hydrog\u00e8ne vert<\/a>.<\/p>\n<p>Ces initiatives refl\u00e8tent la reconnaissance que le syst\u00e8me \u00e9nerg\u00e9tique futur sera fa\u00e7onn\u00e9 non seulement par l\u2019infrastructure, mais \u00e9galement par de nouveaux mod\u00e8les commerciaux et des solutions centr\u00e9es sur le client qui am\u00e9liorent la flexibilit\u00e9 et la participation sur l\u2019ensemble de la cha\u00eene de valeur.<\/p>\n<p>En combinant une expertise solaire \u00e0 grande \u00e9chelle avec un portefeuille de stockage en expansion rapide, des partenariats profonds avec un pipeline d\u2019innovation grandissant, FRV contribue \u00e0 relever l\u2019un des d\u00e9fis centraux de la transition \u00e9nerg\u00e9tique\u00a0: garantir que l\u2019\u00e9lectricit\u00e9 propre est non seulement g\u00e9n\u00e9r\u00e9e \u00e0 grande \u00e9chelle, mais livr\u00e9e d\u2019une mani\u00e8re fiable et flexible, qui appuie les communaut\u00e9s et la r\u00e9silience du syst\u00e8me \u00e0 long terme.<\/p>\n<h2>Cinq faits saillants<\/h2>\n<ol>\n<li><strong>Microsoft a-t-elle atteint son objectif en mati\u00e8re d\u2019\u00e9nergie renouvelable\u00a0?<\/strong><br \/>\nMicrosoft a atteint son objectif pour 2025, qui consistait \u00e0 compenser 100\u00a0% de sa consommation d\u2019\u00e9lectricit\u00e9 par des \u00e9nergies renouvelables, en signant des contrats portant sur des dizaines de gigawatts dans le monde entier.<\/li>\n<li><strong>Quelle est l\u2019ampleur du portefeuille mondial d\u2019\u00e9nergies renouvelables de FRV\u00a0?<\/strong><br \/>\nLe portefeuille de FRV englobe 5\u00a0gigawatts sur quatre continents, couvrant l\u2019\u00e9nergie solaire, le stockage sur batterie et l\u2019infrastructure hybride.<\/li>\n<li><strong>Quel impact le projet solaire Walla Walla aura-t-il en Australie\u00a0?<\/strong><br \/>\nCette installation de 300\u00a0MW fournira une \u00e9nergie propre \u00e0 des dizaines de milliers de foyers chaque ann\u00e9e, tout en cr\u00e9ant des emplois locaux et des investissements dans la communaut\u00e9.<\/li>\n<li><strong>Quelle est la taille du plus grand projet de batterie de FRV \u00e0 ce jour\u00a0?<\/strong><br \/>\nLe SSEB Gnarwarre \u00e0 Victoria, en Australie, est le plus grand projet de batteries de FRV \u00e0 ce jour, avec une capacit\u00e9 de 250\u00a0MW\u00a0\/\u00a0500\u00a0MWh.<\/li>\n<li><strong>\u00c0 quel rythme FRV d\u00e9ploie-t-elle le stockage d\u2019\u00e9nergie en Espagne\u00a0?<\/strong><br \/>\nEn Espagne, FRV pr\u00e9voit de d\u00e9velopper plus de 1,2\u00a0GW et 5\u00a0GWh de capacit\u00e9 de stockage d\u2019ici 2027, de fa\u00e7on \u00e0 accro\u00eetre la flexibilit\u00e9 du r\u00e9seau.<\/li>\n<\/ol>\n<p><a href=\"#_ftnref1\" name=\"_ftn1\">[1]<\/a> <a href=\"https:\/\/blogs.microsoft.com\/blog\/2026\/02\/18\/a-milestone-achievement-in-our-journey-to-carbon-negative\/\">https:\/\/blogs.microsoft.com\/blog\/2026\/02\/18\/a-milestone-achievement-in-our-journey-to-carbon-negative\/<\/a><\/p>\n","protected":false},"author":18,"featured_media":34980,"template":"","tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Comment les engagements climatiques des entreprises acc\u00e9l\u00e8rent-ils la transition \u00e9nerg\u00e9tique ? | Abdul Latif Jameel\u00ae<\/title>\n<meta name=\"description\" content=\"Au-del\u00e0 des cons\u00e9quences environnementales, le changement climatique est d\u00e9sormais largement reconnu comme un risque syst\u00e9mique, qui affecte la s\u00e9curit\u00e9 \u00e9nerg\u00e9tique, les cha\u00eenes d\u2019approvisionnement, la stabilit\u00e9 financi\u00e8re et l\u2019\u00e9quit\u00e9 sociale. Pour les organisations de toutes tailles, la transition vers une \u00e9conomie \u00e0 faibles \u00e9missions de carbone n\u2019est pas une aspiration lointaine, mais un imp\u00e9ratif strat\u00e9gique imm\u00e9diat.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Comment les engagements climatiques des entreprises acc\u00e9l\u00e8rent-ils la transition \u00e9nerg\u00e9tique ? | Abdul Latif Jameel\u00ae\" \/>\n<meta property=\"og:description\" content=\"Au-del\u00e0 des cons\u00e9quences environnementales, le changement climatique est d\u00e9sormais largement reconnu comme un risque syst\u00e9mique, qui affecte la s\u00e9curit\u00e9 \u00e9nerg\u00e9tique, les cha\u00eenes d\u2019approvisionnement, la stabilit\u00e9 financi\u00e8re et l\u2019\u00e9quit\u00e9 sociale. Pour les organisations de toutes tailles, la transition vers une \u00e9conomie \u00e0 faibles \u00e9missions de carbone n\u2019est pas une aspiration lointaine, mais un imp\u00e9ratif strat\u00e9gique imm\u00e9diat.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/\" \/>\n<meta property=\"og:site_name\" content=\"Abdul Latif Jameel\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Abdul.Latif.Jameel.Official\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-03T12:45:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/media.alj.com\/app\/uploads\/2017\/05\/jordansolarprojectstopower.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"840\" \/>\n\t<meta property=\"og:image:height\" content=\"440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/\",\"url\":\"https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/\",\"name\":\"Comment les engagements climatiques des entreprises acc\u00e9l\u00e8rent-ils la transition \u00e9nerg\u00e9tique ? | Abdul Latif Jameel\u00ae\",\"isPartOf\":{\"@id\":\"https:\/\/alj.com\/en\/#website\"},\"datePublished\":\"2026-03-26T12:19:55+00:00\",\"dateModified\":\"2026-04-03T12:45:32+00:00\",\"description\":\"Au-del\u00e0 des cons\u00e9quences environnementales, le changement climatique est d\u00e9sormais largement reconnu comme un risque syst\u00e9mique, qui affecte la s\u00e9curit\u00e9 \u00e9nerg\u00e9tique, les cha\u00eenes d\u2019approvisionnement, la stabilit\u00e9 financi\u00e8re et l\u2019\u00e9quit\u00e9 sociale. Pour les organisations de toutes tailles, la transition vers une \u00e9conomie \u00e0 faibles \u00e9missions de carbone n\u2019est pas une aspiration lointaine, mais un imp\u00e9ratif strat\u00e9gique imm\u00e9diat.\",\"breadcrumb\":{\"@id\":\"https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/alj.com\/fr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Perspectives\",\"item\":\"https:\/\/alj.com\/ja\/perspective\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Alimenter l\u2019avenir : comment les engagements climatiques des entreprises acc\u00e9l\u00e8rent-ils la transition \u00e9nerg\u00e9tique ?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/alj.com\/en\/#website\",\"url\":\"https:\/\/alj.com\/en\/\",\"name\":\"Abdul Latif Jameel\",\"description\":\"Abdul Latif Jameel\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/alj.com\/en\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"fr-FR\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Comment les engagements climatiques des entreprises acc\u00e9l\u00e8rent-ils la transition \u00e9nerg\u00e9tique ? | Abdul Latif Jameel\u00ae","description":"Au-del\u00e0 des cons\u00e9quences environnementales, le changement climatique est d\u00e9sormais largement reconnu comme un risque syst\u00e9mique, qui affecte la s\u00e9curit\u00e9 \u00e9nerg\u00e9tique, les cha\u00eenes d\u2019approvisionnement, la stabilit\u00e9 financi\u00e8re et l\u2019\u00e9quit\u00e9 sociale. Pour les organisations de toutes tailles, la transition vers une \u00e9conomie \u00e0 faibles \u00e9missions de carbone n\u2019est pas une aspiration lointaine, mais un imp\u00e9ratif strat\u00e9gique imm\u00e9diat.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/","og_locale":"fr_FR","og_type":"article","og_title":"Comment les engagements climatiques des entreprises acc\u00e9l\u00e8rent-ils la transition \u00e9nerg\u00e9tique ? | Abdul Latif Jameel\u00ae","og_description":"Au-del\u00e0 des cons\u00e9quences environnementales, le changement climatique est d\u00e9sormais largement reconnu comme un risque syst\u00e9mique, qui affecte la s\u00e9curit\u00e9 \u00e9nerg\u00e9tique, les cha\u00eenes d\u2019approvisionnement, la stabilit\u00e9 financi\u00e8re et l\u2019\u00e9quit\u00e9 sociale. Pour les organisations de toutes tailles, la transition vers une \u00e9conomie \u00e0 faibles \u00e9missions de carbone n\u2019est pas une aspiration lointaine, mais un imp\u00e9ratif strat\u00e9gique imm\u00e9diat.","og_url":"https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/","og_site_name":"Abdul Latif Jameel","article_publisher":"https:\/\/www.facebook.com\/Abdul.Latif.Jameel.Official","article_modified_time":"2026-04-03T12:45:32+00:00","og_image":[{"width":840,"height":440,"url":"https:\/\/media.alj.com\/app\/uploads\/2017\/05\/jordansolarprojectstopower.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/","url":"https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/","name":"Comment les engagements climatiques des entreprises acc\u00e9l\u00e8rent-ils la transition \u00e9nerg\u00e9tique ? | Abdul Latif Jameel\u00ae","isPartOf":{"@id":"https:\/\/alj.com\/en\/#website"},"datePublished":"2026-03-26T12:19:55+00:00","dateModified":"2026-04-03T12:45:32+00:00","description":"Au-del\u00e0 des cons\u00e9quences environnementales, le changement climatique est d\u00e9sormais largement reconnu comme un risque syst\u00e9mique, qui affecte la s\u00e9curit\u00e9 \u00e9nerg\u00e9tique, les cha\u00eenes d\u2019approvisionnement, la stabilit\u00e9 financi\u00e8re et l\u2019\u00e9quit\u00e9 sociale. Pour les organisations de toutes tailles, la transition vers une \u00e9conomie \u00e0 faibles \u00e9missions de carbone n\u2019est pas une aspiration lointaine, mais un imp\u00e9ratif strat\u00e9gique imm\u00e9diat.","breadcrumb":{"@id":"https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/alj.com\/fr\/perspective\/powering-the-future-how-are-corporate-climate-commitments-accelerating-the-energy-transition\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/alj.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Perspectives","item":"https:\/\/alj.com\/ja\/perspective\/"},{"@type":"ListItem","position":3,"name":"Alimenter l\u2019avenir : comment les engagements climatiques des entreprises acc\u00e9l\u00e8rent-ils la transition \u00e9nerg\u00e9tique ?"}]},{"@type":"WebSite","@id":"https:\/\/alj.com\/en\/#website","url":"https:\/\/alj.com\/en\/","name":"Abdul Latif Jameel","description":"Abdul Latif Jameel","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/alj.com\/en\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"fr-FR"}]}},"post-meta-fields":{"amazonS3_cache":["a:8:{s:59:\"\/\/media.alj.com\/app\/uploads\/2026\/03\/Sol-Systems1_2000-1.jpg\";a:2:{s:2:\"id\";i:125935;s:11:\"source_type\";s:13:\"media-library\";}s:68:\"\/\/media.alj.com\/app\/uploads\/2026\/03\/Sol-Systems1_2000-1024x682-1.jpg\";a:2:{s:2:\"id\";i:125935;s:11:\"source_type\";s:13:\"media-library\";}s:62:\"\/\/alj.com\/app\/uploads\/2026\/03\/Sol-Systems1_2000-1024x682-1.jpg\";a:2:{s:2:\"id\";i:125935;s:11:\"source_type\";s:13:\"media-library\";}s:51:\"\/\/media.alj.com\/app\/uploads\/2025\/09\/Walla-Walla.jpg\";a:2:{s:2:\"id\";i:123412;s:11:\"source_type\";s:13:\"media-library\";}s:45:\"\/\/alj.com\/app\/uploads\/2025\/09\/Walla-Walla.jpg\";a:2:{s:2:\"id\";i:123412;s:11:\"source_type\";s:13:\"media-library\";}s:51:\"\/\/media.alj.com\/app\/uploads\/2025\/10\/SIMO-scaled.jpg\";a:2:{s:2:\"id\";i:123823;s:11:\"source_type\";s:13:\"media-library\";}s:45:\"\/\/alj.com\/app\/uploads\/2025\/10\/SIMO-scaled.jpg\";a:2:{s:2:\"id\";i:123823;s:11:\"source_type\";s:13:\"media-library\";}s:53:\"\/\/alj.com\/app\/uploads\/2026\/03\/Sol-Systems1_2000-1.jpg\";a:2:{s:2:\"id\";i:125935;s:11:\"source_type\";s:13:\"media-library\";}}"],"content_series_applied":[""],"featured_on_listing_page":["0"],"is_latest_news":["0"],"mobile_featured_image":["https:\/\/media.alj.com\/app\/uploads\/2017\/05\/jordansolarprojectstopower.jpg"],"perspective_location":["Dubai, EAU"],"perspective_short_title":["Alimenter l\u2019avenir : comment les engagements climatiques des entreprises acc\u00e9l\u00e8rent-ils la transition \u00e9nerg\u00e9tique ?"],"perspective_summury":["<p>Au-del\u00e0 des cons\u00e9quences environnementales, le changement climatique est d\u00e9sormais largement reconnu comme un risque syst\u00e9mique, qui affecte la s\u00e9curit\u00e9 \u00e9nerg\u00e9tique, les cha\u00eenes d\u2019approvisionnement, la stabilit\u00e9 financi\u00e8re et l\u2019\u00e9quit\u00e9 sociale. Pour les organisations de toutes tailles, la transition vers une \u00e9conomie \u00e0 faibles \u00e9missions de carbone n\u2019est pas une aspiration lointaine, mais un imp\u00e9ratif strat\u00e9gique imm\u00e9diat.<\/p>\n"],"publish_mobile":[""],"push_notification":["no"],"wpcf-card_article_content":["write your content"],"wpcf-card_article_with_title_content":[""],"wpcf-featured-news":["0"],"wpcf-layoutvideourl":[""],"wpcf-perspective-downloadable_file":[""],"wpcf-perspective-published-date":["1774483200"],"wpcf-quotes-with-auther-text":[""],"wpcf-quotes-with-auther-text-1":[""],"wpcf-show-news-at-homepage":["1"],"wpcf-social-image-square":[""],"wpcf-social-svg-square":[""],"wpcf-social-text-image-square":[""],"wpcf-social-text-square":[""],"wpcf-social-text-svg-square":[""],"wpcf-social-text-text-square":[""],"wpcf-social-text-url-square":[""],"wpcf-social-url-square":[""],"wpcf-social1-background-image":[""],"wpcf-social1-svg":[""],"wpcf-social1-text":[""],"wpcf-social1-url":[""],"wpcf-social2-background-image":[""],"wpcf-social2-svg":[""],"wpcf-social2-text":[""],"wpcf-social2-url":[""],"wpcf-social3-background-image":[""],"wpcf-social3-svg":[""],"wpcf-social3-text":[""],"wpcf-social3-url":[""],"wpcf-social4-background-image":[""],"wpcf-social4-svg":[""],"wpcf-social4-text":[""],"wpcf-social4-url":[""],"wpcf-video-description":[""],"wpcf-video-thumb":[""],"_":["field_6746fdff672ad"],"_bsf_item_review_type":["none"],"_bsf_post_type":["0"],"_content_series_applied":["field_60f3d3faf82ac"],"_featured_on_listing_page":["field_62458ea7383c3"],"_mobile_featured_image":["field_5c3b204983dea"],"_oembed_6cfa0a3218c2b5af74b5ff0941a774cd":["<iframe title=\"FRVs&#039; Jameel Energy announce the financial close of Gnarwarre solar PV plant (EN VO Subs)\" width=\"486\" height=\"273\" src=\"https:\/\/www.youtube.com\/embed\/N7eVrwjCSag?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>"],"_oembed_a6e89459156ec85d25a1968d7c508341":["<iframe title=\"Jameel Energy &amp; FRV Australia announce Walla Walla PV plant completion (EN VO subs)\" width=\"486\" height=\"273\" src=\"https:\/\/www.youtube.com\/embed\/eszUTkAGcI4?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>"],"_oembed_aa1d29058ac2a79ddb294df09616952e":["<iframe title=\"Jameel Energy &amp; FRV Australia announce Walla Walla PV plant completion (EN VO subs)\" width=\"640\" height=\"360\" src=\"https:\/\/www.youtube.com\/embed\/eszUTkAGcI4?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>"],"_oembed_bac06c140b2c59fe949255159e2da26a":["<iframe title=\"Jameel Energy&#039;s FRV announces over 1.2 GW BESS expansion in Spain (EN VO Subs)\" width=\"486\" height=\"273\" src=\"https:\/\/www.youtube.com\/embed\/0Rg1kLd17QY?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>"],"_oembed_bef6f2abfc313401babc6619ccda3599":["<iframe title=\"FRVs&#039; Jameel Energy announce the financial close of Gnarwarre solar PV plant (EN VO Subs)\" width=\"640\" height=\"360\" src=\"https:\/\/www.youtube.com\/embed\/N7eVrwjCSag?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>"],"_oembed_e4d41446a91f503c7bf18568d30c69d3":["<iframe title=\"Jameel Energy&#039;s FRV announces over 1.2 GW BESS expansion in Spain (EN VO Subs)\" width=\"640\" height=\"360\" src=\"https:\/\/www.youtube.com\/embed\/0Rg1kLd17QY?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>"],"_oembed_time_6cfa0a3218c2b5af74b5ff0941a774cd":["1774525656"],"_oembed_time_a6e89459156ec85d25a1968d7c508341":["1774525656"],"_oembed_time_aa1d29058ac2a79ddb294df09616952e":["1775216934"],"_oembed_time_bac06c140b2c59fe949255159e2da26a":["1774525656"],"_oembed_time_bef6f2abfc313401babc6619ccda3599":["1775216935"],"_oembed_time_e4d41446a91f503c7bf18568d30c69d3":["1775216935"],"_publish_mobile":["field_5bfa8eb2e65cf"],"_push_notification":["field_5c3b1fb67034d"],"_wpml_media_duplicate":["1"],"_wpml_media_featured":["1"],"_wpml_word_count":["{\"total\":2366,\"to_translate\":{\"ar\":2366,\"zh-hans\":2366,\"fr\":2366,\"ja\":2366,\"es\":2366,\"tr\":2366}}"],"_yoast_wpseo_content_score":["30"],"_yoast_wpseo_estimated-reading-time-minutes":[""],"_yoast_wpseo_metadesc":["Au-del\u00e0 des cons\u00e9quences environnementales, le changement climatique est d\u00e9sormais largement reconnu comme un risque syst\u00e9mique, qui affecte la s\u00e9curit\u00e9 \u00e9nerg\u00e9tique, les cha\u00eenes d\u2019approvisionnement, la stabilit\u00e9 financi\u00e8re et l\u2019\u00e9quit\u00e9 sociale. Pour les organisations de toutes tailles, la transition vers une \u00e9conomie \u00e0 faibles \u00e9missions de carbone n\u2019est pas une aspiration lointaine, mais un imp\u00e9ratif strat\u00e9gique imm\u00e9diat."],"_yoast_wpseo_title":["Comment les engagements climatiques des entreprises acc\u00e9l\u00e8rent-ils la transition \u00e9nerg\u00e9tique ? | Abdul Latif Jameel\u00ae"],"_yoast_wpseo_wordproof_timestamp":[""],"_thumbnail_id":["34980"],"_edit_lock":["1775220367:18"],"_edit_last":["18"],"wpcf-projecttitle":[""],"wpcf-projectdescription":[""],"wpcf-projectimage-video1":["image"],"wpcf-projectimage-1":[""],"wpcf-projectvideo-1":[""],"wpcf-projectdescription-1":[""],"wpcf-projectimage-video2":["image"],"wpcf-projectimage-2":[""],"wpcf-projectvideo-2":[""],"wpcf-projectdescription-2":[""],"wpcf-projectimage-video3":["image"],"wpcf-projectimage-3":[""],"wpcf-projectvideo-3":[""],"wpcf-projectdescription-3":[""],"wpcf-projectimage-video4":["image"],"wpcf-projectimage-4":[""],"wpcf-projectvideo-4":[""],"wpcf-projectdescription-4":[""],"_last_translation_edit_mode":["native-editor"],"perspective_business_sector":["Services \u00c9nerg\u00e9tiques et Environnementaux"],"wpcf-card-image":[""],"_wpcf-card-image-sort-order":["a:1:{i:0;i:2078200;}"]},"_links":{"self":[{"href":"https:\/\/alj.com\/fr\/wp-json\/wp\/v2\/perspective\/125974"}],"collection":[{"href":"https:\/\/alj.com\/fr\/wp-json\/wp\/v2\/perspective"}],"about":[{"href":"https:\/\/alj.com\/fr\/wp-json\/wp\/v2\/types\/perspective"}],"author":[{"embeddable":true,"href":"https:\/\/alj.com\/fr\/wp-json\/wp\/v2\/users\/18"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alj.com\/fr\/wp-json\/wp\/v2\/media\/34980"}],"wp:attachment":[{"href":"https:\/\/alj.com\/fr\/wp-json\/wp\/v2\/media?parent=125974"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alj.com\/fr\/wp-json\/wp\/v2\/tags?post=125974"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}